Engineering the End of Sludge
What is DRACO?
DRACO is a HydroThermal Carbonization (HTC) solution for sludge volume reduction. It reduces sludge volume by 80% and up to 90% with a dryer preventing sticky phase reducing overall energy costs.
When combined with an anaerobic digestor, DRACO system increases biogas production by over 30% .
DRACO can also be integrated with heat-generating plants such as incinerators, coal-fired power plants, and cement plants. By utilizing waste steam from these facilities as a heat source, it operates without the need for external energy input.
In addition, DRACO retrofits existing sludge dryer process, eliminating sticky phase issues, stabilizing dryer operation, and reducing 70% of energy costs.
-
Less Sludge, More Biogas
-
Sludge Reduction, Zero Energy Bill
-
Retrofit Your Dryer: From Old to Optimal
Volatile Solids (VS) trapped inside cells become available and easier to digest
Engineered to handle non-homogeneous feed sludge directly, eliminating the need for any pretreatment
Viscosity drops & some particulate COD is converted to soluble form
Cell walls fully broken down releasing intracellular water makes dewatering easier, reducing the final sludge volume to be handled or hauled
DRACO exposes sludge to heat & pressure, breaking open cell walls and simplifying complex organic matter.
System Configuration
DRACO is a patented HTC system using a batch process with stepwise heating, pressurizing, cooling, and depressurizing of biosolids
Components:
Hopper
Pre-heating Tank
Reactors
Decompression Tank
Heat Exchanger
Filter Press
Hydrolysis, Dehydration, Decarboxylation
Inside the reactors
DRACO can process sludge regardless of water content through effective mixing and high heat transfer efficiency, using a patented multi-point steam injection technology
Improved contact between sludge & steam through the use of an agitator
Enhanced heat transfer efficiency through patented multi-point steam injection technology
Uniform heat distribution enables complete reaction of organic waste
Heat transfer efficiency validated through 3D flow analysis
Performance: Sludge Volume Reduction
DRACO Pilot Unit
Pilot proven. Scalable by design.
-
2 tons/day
-
2 × 20-foot-high cube containers including 3 vertical opening doors
All Package System: DRACO SKID, Steam Boiler, Dewatering SKID
-
Decompression Tank: U Stamp in accordance with American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (BPVC)
Monitoring & Control System: Underwriters Laboratories (UL) Certification & American National Standards Institute (ANSI) Standards
-
More than 50% Dry Solid (DS) of final cake (achieving more than 80% of SVR)
► Including elimination of pathogens under Class A30% more biogas production
► Evaluate results with Biochemical Methane Potential (BMP) test
FAQs
Is DRACO Hydrothermal Carbonization (HTC) or Thermal Hydrolysis Process (THP)?
DRACO can be both HTC and THP depending on an operation set-up.
HTC: Temp. >190°C / Pressure ~12 bar / ~30 min THP: Temp. <170°C / Pressure ~7 bar / ~20 min
How much solids can DRACO process?
DRACO can process solids up to 23~25% while usual THP or similar systems can process around 12~16%
Does “sticky phase” become a problem within the system?
DRACO + Filter Press process solves the “sticky phase”
Does DRACO destroy PFAS?
DRACO does NOT destroy PFAS.
But DRACO can be an effective and economical pretreatment to PFAS issues. Due to its sludge volume reduction, PFAS can be concentrated into much smaller and drier sludge which enhances efficiency of downstream destruction (e.g., pyrolysis, gasification)
Is pre-treatment necessary?
It is case-specific but most of the time, No
DRACO Reference
Operation | Annual capacity (tons DS/yr) |
Location (City, Country) |
Application type/Purpose |
---|---|---|---|
2019 | 7,300 (100 wet tons/d @ 20% DS) |
Gimhae, Korea |
HTC - Operating Sludge volume reduction (w/o AD). Mixed municipal sludge and slaughterhouse waste |
2025 | 5,840 (100 wet tons/d @ 16% DS) |
Seosan, Korea |
HTC - Operating Application as a pretreatment to improve drying performance Municipal sludge volume reduction |
2028 (Booked) |
32,522 (495 wet tons/d @ 18% DS) |
Daejeon, Korea |
THP - Under Construction Increase biogas production (Pre-AD) Municipal WAS-only THP |
2029 (Booked) |
5,913 (90 wet tons/d @ 18% DS) |
Mokpo, Korea |
THP - In Design (P3) Increase biogas production (Pre-AD) Municipal sludge THP |
2029 (Booked) |
2,803 (128 wet tons/d @ 6% DS) |
Gwangju, Korea |
THP - In Design (P3) Increase biogas production (Pre-AD) Municipal sludge THP |