Jungnang Wastewater Recovery Facility

Leveraging high-rate biofiltration to reclaim valuable space in the Heart of Seoul

 

The Jungnang Water Resource Recovery Facility, located in the heart of Seoul, is one of the largest in Korea and was designed as a water reuse center to protect the ecosystem of the Han River.

Conventional primary clarifiers were retrofitted with Proteus Primary biofilters to upgrade the facility’s overall process to reclaim needed space while increasing treatment capacity. This process replaced a traditional primary settling, MLE activated sludge, and secondary clarifier process with a novel treatment train based on the Proteus biofilter. In the new design, screened and degritted municipal sewage is passed through three sequential upflow biofilter stages.

Following the three biofilters, effluent is flocculated and filtered using a membrane disc filter for total phosphorus control, followed by UV disinfection and discharge to surface waters.

The new treatment train has operated at full capacity since September of 2017. Over 6 months, hydraulic residence time (from primary through tertiary treatment) averaged 3.5 hours, a 70% reduction from the previous average of 11 hours.

The footprint of the new treatment train was reduced by 64%. Primary treatment alone achieved a 50% reduction in suspended solids, at an HRT of 10.6 minutes, representing an 80% footprint reduction. These reductions were achieved using an innovative, high-loading filtration media, while overall treatment costs for the new process were not significantly different from traditional MLE processes.

Moreover, the entire train was constructed underground, and a public park was built above the site.

Three sequential upflow biofiltration stages

  • Stage 1

    The first biofilter replaces conventional primary clarifiers to optimize suspended solids removal

  • Stage 2

    The second biofilter performs biological denitrification using carbon diverted from the first staged, followed by aerobic oxidation of organic compounds.

  • Stage 3

    The third biofilter performs aerobic nitrification and recycles nitrates back to the denitrifying second stage.

Exceptional Performance

Over six months, performance of the new Proteus biofiltration system maintained or exceeded treatment targets averaging:

61% Reduction in Suspended Solids

43% Reduction in BOD

24% Reduction in Total Phosphorus

 

 

Performance Data


Parameter

BOD5

TSS

TN

TP

Influent

120

102

33

3.1

Permit

10

10

20

0.5

Plant Effluent

1.4

2.5

13

0.23


 

Shrink footprints while increasing treatment capacity

Hydraulic residence time (from primary through tertiary treatment) averaged 3.5 hours, a 70% reduction from the previous average of 11 hours.

The footprint of the new treatment train was reduced by 64%, while primary treatment alone achieved an 80% footprint reduction.

Reclaim valuable space

Retrofitting even parts of its treatment train in land-limited water recovery facilities can free up significant land resources for additional treatment or property development, without increasing operating costs. This could enable space-constrained plants to achieve goals such as biological nutrient removal or onsite advanced treatment for the first time.